page_banner

Q235B Galvanized Channel Steel Low Alloy U-Shape Steel Construction Project Steel Structure Profile Light Steel Channel Steel

Q235B Galvanized Channel Steel Low Alloy U-Shape Steel Construction Project Steel Structure Profile Light Steel Channel Steel

Short Description:

Among various coating methods for protecting steel substrates, hot dip galvanizing is an excellent one. It is when zinc is in a liquid state, and after a very complex physical and chemical reaction, the steel is not only plated with a thicker layer of pure zinc, but also a zinc-iron alloy layer is formed. This plating method not only has the corrosion resistance characteristics of electroplated zinc, but also has a zinc-iron alloy layer. It also has strong corrosion resistance that cannot be compared with electroplated zinc. Therefore, this plating method is particularly suitable for various strong corrosive environments such as strong acid and alkali mist.


  • Grade: Q235/Q355
  • Shape: C/U Channel, C/U channel
  • Application: Steel Structual
  • Processing Service: Bending, Welding, Punching, Decoiling, Cutting
  • Delivery Time: 7-15 Days
  • Payment Term: L/C T/T (30% Deposit)
  • Thickness: 0.5mm-3.0mm
  • Size: Customized
  • Processing Service: Welding, Punching, Cutting
  • Product Detail

    Product Tags

    Product Detail

    Product Name

     

    Material

    10#, 20#, 45#, 16Mn, A53(A,B), Q235, Q345, Q195, Q215, St37, St42, St37-2, St35.4, St52.4, ST35

    Width:

    1-300mm

    Thickness

    0.8mm-3.0mm

    Length

     

    1-12000mm
     or as customer's actual reques

    Standard

     

    ASTM 

    Grade

     

    Q235,Q345,Q355 

    Section Shape

    C Channel

    Technique

    Hot/Cold Rolled

    Packing

    Standard Seaworthy Packing or as your requirements

    MOQ

    1 Tons, more quantity price will be lower

    Inspection

    With Hydraulic Testing, Eddy Current , Infrared Test

    Product Application

    structure construction,steel grating, tools

    Origin

    Tianjin China

    Certificates

     ISO9001-2008,SGS.BV,TUV

    Delivery Time

    Usually within 10-45 days after receipt of advance payment
    Steel channel
    Steel channel (4)
    Steel channel (5)

    Main Application

    1

    The  layer is formed by zinc in a high-temperature liquid state in three steps:
    1. The iron-based surface is dissolved by the zinc liquid to form a zinc-iron alloy phase layer;
    2. The zinc ions in the alloy layer further diffuse to the matrix to form a zinc-iron miscibility layer;
    3. The surface of the alloy layer is surrounded by a zinc layer.

    Note:
    1.Free sampling, 100% after-sales quality assurance, Support any payment method;
    2.All other specifications of round carbon steel pipes are available according to your requirement (OEM&ODM)! Factory price you will get from ROYAL GROUP.

    Size Chart

    规格 重量(kg/m) 规格 重量(kg/m)
    80×40×20×2.5 3.925 180×60×20×3 8.007
    80×40×20×3 4.71 180×70×20×2.5 7.065
    100×50×20×2.5 4.71 180×70×20×3 8.478
    100×50×20×3 5.652 200×50×20×2.5 6.673
    120×50×20×2.5 5.103 200×50×20×3 8.007
    120×50×20×3 6.123 200×60×20×2.5 7.065
    120×60×20×2.5 5.495 200×60×20×3 8.478
    120×60×20×3 6.594 200×70×20×2.5 7.458
    120×70×20×2.5 5.888 200×70×20×3 8.949
    120×70×20×3 7.065 220×60×20×2.5 7.4567
    140×50×20×2.5 5.495 220×60×20×3 8.949
    140×50×20×3 6.594 220×70×20×2.5 7.85
    160×50×20×2.5 5.888 220×70×20×3 9.42
    160×50×20×3 7.065 250×75×20×2.5 8.634
    160×60×20×2.5 6.28 250×75×20×3 10.362
    160×60×20×3 7.536 280×80×20×2.5 9.42
    160×70×20×2.5 6.673 280×80×20×3 11.304
    160×70×20×3 8.007 300×80×20×2.5 9.813
    180×50×20×2.5 6.28 300×80×20×3 11.775
    180×50×20×3 7.536    
    180×60×20×2.5 6.673  

    Process of production

    Feeding (1), leveling (2), forming (3), shape (4) - straightening (5 - measuring 6 - brace round hole( 7) - elliptical connection hole(8)- forming cut pet-name ruby(9)

    图片2

    Product Inspection

    Steel channel (2)
    Steel channel (3)

    Packing and Transportation

    Packaging:  needs to be packaged before transportation, usually using wooden pallets or steel strapping to ensure that the goods are not damaged during transportation.

    Anti-rust treatment: Galvanized channel steel needs to be anti-rust before packaging to prevent corrosion caused by moisture or rain during transportation.

    Transportation: Choose appropriate transportation, such as trucks or containers, to ensure that the goods are stable and not squeezed during transportation.

    Cargo identification: Mark clear cargo information on the packaging, including cargo name, quantity, weight, size, etc., to facilitate identification and management during transportation.

    Cargo protection: During loading and unloading, care should be taken to handle cargo gently to avoid collision and friction to protect the surface of the cargo from damage.

    To sum up, during the transportation and packaging process of galvanized channel steel, attention must be paid to packaging, anti-rust treatment, transportation tool selection, cargo identification, and cargo protection to ensure that the goods reach their destination safely.

    Steel channel (6)

    Transportation: Express (Sample Delivery), Air, Rail, Land, Sea shipping (FCL or LCL or Bulk)

    packing1

    Our Customer

    Steel channel

    FAQ

    Q: Are u a manufacturer?

    A: Yes, we are spiral steel tube manufacturer locates in Daqiuzhuang village, Tianjin city, China

    Q: Can I have a trial order only several tons?

    A: Of course. We can ship the cargo for u with LCL serivece.(Less container load)

    Q: Do u have payment superiority?

    A: For big order, 30-90 days L/C can be acceptable.

    Q: If sample free?

    A: Sample free, but the buyer pays for the freight.

    Q: Are you gold supplier and do trade assurance?

    A: We seven years cold supplier and accept trade assurance.


  • Previous:
  • Next:

  • Write your message here and send it to us