High Quality Pre-Insulated Steel Pipe Polyurethane Foam Insulation Pipe Overhead Insulation Pipe
Our company sticks to the principle of “Quality is the life of the company, and reputation is the soul of it” for High Quality Pre-Insulated Steel Pipe Polyurethane Foam Insulation Pipe Overhead Insulation Pipe, We welcome new and aged buyers from all walks of lifestyle to call us for foreseeable future business associations and reach mutual results!
Our company sticks to the principle of “Quality is the life of the company, and reputation is the soul of it” for China High Temperature Resistant Pipe and Epoxy Resin Direct Buried Insulation Pipe, They are sturdy modeling and promoting effectively all over the world. Never ever disappearing major functions within a quick time, it’s a have to for you personally of fantastic good quality. Guided by the principle of “Prudence, Efficiency, Union and Innovation. the corporation. ake an excellent efforts to expand its international trade, raise its organization. rofit and raise its export scale. We are confident that we’ve been likely to have a bright prospect and to be distributed all over the world in the years to come.
Product Detail
Type | Welded Carbon Steel Pipe | |
Materials | API 5L /A53 /A106 GRADE B and other material which client inquired | |
Size | Outer Diameter | 17-914mm 3/8″-36″ |
Wall Thickness | SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80 SCH100 SCH120 SCH140 SCH160 XXS |
|
Length | Single random length/Double random length 5m-14m,5.8m,6m,10m-12m,12m or as customer’s actual request |
|
Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. | |
Surface Treatment | Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating | |
Technical Methods | Hot-rolled/Cold-drawn/Hot-expanded | |
Testing Methods | Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and physical property inspection |
|
Packaging | Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer’s requests |
|
Origin | China | |
Application | Conveying oil gas and water | |
Third Party Inspection | SGS BV MTC | |
Trade Terms | FOB CIF CFR | |
Payment Terms | FOB 30%T/T,70% before shipment CIF 30% pre-payment and the balance to be paid before making shipment or Irrevocable 100% L/C at sight |
|
MOQ | 10 tons | |
Supply Capacity | 5000 T/M | |
Delivery Time | Usually within 7-10 days after receipt of advance payment |
DN | OD Outside Diameter |
ASTM A36 GR. A Round Steel Pipe | BS1387 EN10255 | ||||
SCH10S | STD SCH40 | LIGHT | MEDIUM | HEAVY | |||
MM | INCH | MM | (mm) | (mm) | (mm) | (mm) | (mm) |
15 | 1/2” | 21.3 | 2.11 | 2.77 | 2 | 2.6 | - |
20 | 3/4” | 26.7 | 2.11 | 2.87 | 2.3 | 2.6 | 3.2 |
25 | 1” | 33.4 | 2.77 | 3.38 | 2.6 | 3.2 | 4 |
32 | 1-1/4” | 42.2 | 2.77 | 3.56 | 2.6 | 3.2 | 4 |
40 | 1-1/2” | 48.3 | 2.77 | 3.68 | 2.9 | 3.2 | 4 |
50 | 2” | 60.3 | 2.77 | 3.91 | 2.9 | 3.6 | 4.5 |
65 | 2-1/2” | 73 | 3.05 | 5.16 | 3.2 | 3.6 | 4.5 |
80 | 3” | 88.9 | 3.05 | 5.49 | 3.2 | 4 | 5 |
100 | 4” | 114.3 | 3.05 | 6.02 | 3.6 | 4.5 | 5.4 |
125 | 5” | 141.3 | 3.4 | 6.55 | - | 5 | 5.4 |
150 | 6” | 168.3 | 3.4 | 7.11 | - | 5 | 5.4 |
200 | 8” | 219.1 | 3.76 | 8.18 | - | - | - |
Product Description
Main Application:
1. Fluid / Gas delivery, Steel structure, Construction;
2. ROYAL GROUP ERW/Welded round carbon steel pipes, which with Highest quality and strong supply ability are widely used in Steel structure and Construction.
Note:
1. Free sampling, 100% after-sales quality assurance, Support any payment method;
2. All other specifications of round carbon steel pipes are available according to your requirement (OEM&ODM)! Factory price you will get from ROYAL GROUP.
First of all, raw material uncoiling: The billet used for it is generally steel plate or It is made of strip steel, then the coil is flattened, the flat end is cut and welded-looper-forming-welding-inner and outer weld bead removal-pre-correction-induction heat treatment-sizing and straightening-eddy current testing-cutting- Water pressure inspection—pickling—final quality inspection and size test, packaging—and then out of the warehouse.
Packing and Transportation
Packaging is generally naked, steel wire binding, very strong.
If you have special requirements, you can use rust proof packaging, and more beautiful.
Transportation: Express (Sample Delivery), Air, Rail, Land, Sea shipping (FCL or LCL or Bulk)
FAQ
Q: Are u a manufacturer?
A: Yes, we are spiral steel tube manufacturer locates in Daqiuzhuang village, Tianjin city, China
Q: Can I have a trial order only several tons?
A: Of course. We can ship the cargo for u with LCL serivece.(Less container load)
Q: Do u have payment superiority?
A: For big order, 30-90 days L/C can be acceptable.
Q: If sample free?
A: Sample free, but the buyer pays for the freight.
Q: Are you gold supplier and do trade assurance?
A: We seven years cold supplier and accept trade assurance.Our company sticks to the principle of “Quality is the life of the company, and reputation is the soul of it” for High Quality Pre-Insulated Steel Pipe Polyurethane Foam Insulation Pipe Overhead Insulation Pipe, We welcome new and aged buyers from all walks of lifestyle to call us for foreseeable future business associations and reach mutual results!
High Quality China High Temperature Resistant Pipe and Epoxy Resin Direct Buried Insulation Pipe, They are sturdy modeling and promoting effectively all over the world. Never ever disappearing major functions within a quick time, it’s a have to for you personally of fantastic good quality. Guided by the principle of “Prudence, Efficiency, Union and Innovation. the corporation. ake an excellent efforts to expand its international trade, raise its organization. rofit and raise its export scale. We are confident that we’ve been likely to have a bright prospect and to be distributed all over the world in the years to come.