Chinese Manufacturer q235b A36 Carbon Dteel Black Iron Steel Welded Pipe
Type
|
||
Materials
|
API 5L /A53 /A106 GRADE B and other material which client inquired
|
|
Size
|
Outer Diameter
|
17-914mm 3/8"-36"
|
Wall Thickness
|
SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS |
|
Length
|
Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request |
|
Ends
|
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
|
|
Surface Treatment
|
Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating
|
|
Technical Methods
|
Hot-rolled/Cold-drawn/Hot-expanded
|
|
Testing Methods
|
Pressure test,Flaw detection,Eddy current testing, Hydro static testing
or Ultrasonic examination and also with chemical and
physical property inspection |
|
Packaging
|
Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven
bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer's requests |
|
Origin
|
China
|
|
Application
|
Conveying oil gas and water
|
|
Third Party Inspection
|
SGS BV MTC
|
|
Trade Terms
|
FOB CIF CFR
|
|
Payment Terms
|
FOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment or Irrevocable 100% L/C at sight |
|
MOQ
|
10 tons
|
|
Supply Capacity
|
5000 T/M
|
|
Delivery Time
|
Usually within 10-45 days after receipt of advance payment
|
Size Chart:
DN |
OD Outside Diameter |
ASTM A36 GR. A Round Steel Pipe | BS1387 EN10255 | ||||
SCH10S | STD SCH40 | LIGHT | MEDIUM | HEAVY | |||
MM | INCH | MM | (mm) | (mm) | (mm) | (mm) | (mm) |
15 | 1/2” | 21.3 | 2.11 | 2.77 | 2 | 2.6 | - |
20 | 3/4” | 26.7 | 2.11 | 2.87 | 2.3 | 2.6 | 3.2 |
25 | 1” | 33.4 | 2.77 | 3.38 | 2.6 | 3.2 | 4 |
32 | 1-1/4” | 42.2 | 2.77 | 3.56 | 2.6 | 3.2 | 4 |
40 | 1-1/2” | 48.3 | 2.77 | 3.68 | 2.9 | 3.2 | 4 |
50 | 2” | 60.3 | 2.77 | 3.91 | 2.9 | 3.6 | 4.5 |
65 | 2-1/2” | 73 | 3.05 | 5.16 | 3.2 | 3.6 | 4.5 |
80 | 3” | 88.9 | 3.05 | 5.49 | 3.2 | 4 | 5 |
100 | 4” | 114.3 | 3.05 | 6.02 | 3.6 | 4.5 | 5.4 |
125 | 5” | 141.3 | 3.4 | 6.55 | - | 5 | 5.4 |
150 | 6” | 168.3 | 3.4 | 7.11 | - | 5 | 5.4 |
200 | 8” | 219.1 | 3.76 | 8.18 | - | - | - |






Main Application:
1. Fluid / Gas delivery, Steel structure, Construction;
2. ROYAL GROUP ERW/Welded round carbon steel pipes, which with Highest quality and strong supply ability are widely used in Steel structure and Construction.
Note:
1. Free sampling, 100% after-sales quality assurance, Support any payment method;
2. All other specifications of round carbon steel pipes are available according to your requirement (OEM&ODM)! Factory price you will get from ROYAL GROUP.
Process of production
The production process of hot-rolled round welded pipe mainly includes the following steps:
1. Raw Material Preparation
Material selection: Low-carbon steel strip or coil (such as Q235, Q345, etc.) is usually used as raw material to ensure that the material thickness and width meet the product specifications.
Uncoiling and leveling: The strip coil is unrolled by the uncoiling machine, and the rolling stress is eliminated by the leveling machine to ensure the flatness of the strip.
2. Forming
Rough forming: The strip is gradually bent into a round tube shape by multiple sets of rollers to form an open "U" or "O" shaped section.
Fine forming: Further adjust the size to ensure the roundness and pipe diameter accuracy, and prepare for subsequent welding.
3. Welding
High-frequency resistance welding (HFIW): High-frequency current is used to generate resistance heat at the joint to melt the edge of the steel strip, and welding is achieved through the pressure of the extrusion roller.
Weld seam treatment: Online flaw detection (such as ultrasonic testing) is performed immediately after welding to ensure that the weld has no defects such as pores and cracks.
4. Sizing and Straightening
Sizing: Adjust the outer diameter of the steel pipe through the sizing machine to ensure dimensional accuracy.
Straightening: Use a straightening machine to eliminate the bending deformation of the steel pipe and make it reach the standard straightness.
5. Cooling and Cutting
Cooling: The welded steel pipe is quickly cooled through the cooling water tank to avoid thermal deformation.
Cutting: Cut the steel pipe into fixed lengths (such as 6 meters, 12 meters) with a flying saw or laser cutting machine according to needs.
6. Surface Treatment and Inspection
Deburring: Remove burrs inside and outside the weld to ensure a smooth surface.
Hydraulic pressure test: Apply a certain pressure to the steel pipe to detect water leakage and ensure sealing.
Appearance inspection: Manually or automatically detect surface defects (such as scratches and dents) and mark unqualified products.
7. Packaging and Warehousing
Oil anti-rust: Apply anti-rust oil to the surface of the steel pipe to prevent corrosion.
Marking and packaging: Mark specifications, batch numbers and other information, and bundle and package according to customer requirements before warehousing.
Key Technical Points
Welding process: High-frequency welding is efficient and low-cost, suitable for small and medium diameter pipes; large diameter pipes may use submerged arc welding (SAW).
Dimension control: The forming and sizing processes require precise control of roller parameters to ensure uniform pipe diameter and wall thickness.
Quality inspection: Online flaw detection and water pressure testing are the core links to ensure weld quality.

Packaging is generally naked, steel wire binding, very strong.
If you have special requirements, you can use rust proof packaging, and more beautiful.

Transportation: Express (Sample Delivery), Air, Rail, Land, Sea shipping (FCL or LCL or Bulk)


Our Customer
Q: Are u a manufacturer?
A: Yes, we are spiral steel tube manufacturer locates in Daqiuzhuang village, Tianjin city, China
Q: Can I have a trial order only several tons?
A: Of course. We can ship the cargo for u with LCL serivece.(Less container load)
Q: Do u have payment superiority?
A: For big order, 30-90 days L/C can be acceptable.
Q: If sample free?
A: Sample free, but the buyer pays for the freight.
Q: Are you gold supplier and do trade assurance?
A: We seven years cold supplier and accept trade assurance.